Policy and market dual stimulation Plastic injection molding manufacturers have a long way to go
For high gloss molds with complex cavities, the mold repair time is usually 2-3 minutes, while the molding cycle is 13-20 minutes. If less mold repair time is used, it takes 12-15 minutes, while the molding cycle is usually 1-3 minutes. In recent years, the mold industry has developed rapidly and has a wide scale, forming two major systems, namely, the synchronous promotion of mold design and development and the synchronous promotion of mold product design. It can be seen that the development of mold has great significance. Starting in 1983, after several years in China's mold industry, mold enterprises have completely shaken off the dependence on manual workshops, thereby demonstrating their competitiveness as independent sites. At present, China's mold production value, mold standard parts production value, and total exports have maintained an average annual level< eod>。


Related news
Our Certificates
By co-operating with Elite Mold, you have selected one of the most reliable ISO 9001 certified plastic mold manufacturer, Elite Mold as a plastic injection mold manufacturer specializing in plastic injection mold and supplying plastic injection molding services for plastic mold design, prototype makings, mold flow analysis, precise machining, OEM services, ODM services and so on, building custom plastic injection molding. We are committed to enhance the Process optimized and quality of service, shorten lead time and assist in lowering inventory, by providing new products every year to bring in continuous and higher profits for our clients. The ability to produce mold at the International standard, strong engineering and mold design capability, aggressive delivery, competitive pricing and business integrity continues to be the success factor of Elite Mold.